projects lead and managed

Public Works

The Public Works Department is responsible for the construction, maintenance, and preservation of the physical condition of the city.

Public Works Department duties include:

  • Street, sidewalk, curb, and gutter repair
  • Ball-field, playground, and park maintenance
  • Beautification and landscaping
  • Fleet maintenance
  • Grass mowing
  • Intra-city transit (Greenbelt Connection)
  • Leaf, brush, and yard waste collection
  • Recreation facilities maintenance
  • Refuse and Recycling
  • Road signage and traffic lane marking
  • Snow removal
  • Tree planting and grounds maintenance

projects
CONTACT
Willis Schafer, Director of Public Works
Email
publicworks@greenbeltmd.gov
phone
(301) 474-8004
projects lead
19
SUM PROJECT COSTS
$
ARPA PROJECTS

Projects lead by

Public Works

Annual Concrete Infrastructure Repair

City-wide concrete road repair
Infrastructure
PROJECT COST
$
Details

Annual Road Resurfacing

These funds are for resurfacing our streets
Infrastructure
PROJECT COST
$
Details

Bridge Repair

Costs to repair bridge
Infrastructure
PROJECT COST
$
Details

Buddy Attick Park Inclusive Playground

Provide a more inclusive playground to meet the needs of all visitors
Infrastructure
PROJECT COST
$
Details

Community Center Update

Update the chillers and replace the boilers in the Community Center
Infrastructure
PROJECT COST
$
Details

Deep Tine Aerator (Parks)

Purchased a deep tine aerator for our parks.
Infrastructure
PROJECT COST
$
Details

Drainage Culvert

Infrastructure
PROJECT COST
$
Details

Dump Truck (Parks)

Purchase a 1/2 ton dump truck for our parks
Infrastructure
PROJECT COST
$
Details

Dump Truck (Public Works)

Purchase a 1/2 ton dump truck for our Public Works department.
Infrastructure
PROJECT COST
$
Details

Electric Bus

Purchase an electric bus for use by Recreation and Public Works
Infrastructure
PROJECT COST
$
Details

Ford Custom Cab (Parks)

Purchase a Ford custom cab
Infrastructure
PROJECT COST
$
Details

Fuel Management System

Replace Public Works' fuel management system used for all City vehicles
Infrastructure
PROJECT COST
$
Details

GAFC Pool Remediation

Implement the recommendations for repair at the Greenbelt Aquatic and Fitness Center pool.
Infrastructure
PROJECT COST
$
Details

Municipal Building & Springhill Lake Recreation Center HVAC

Replace the Municipal Building's aging HVAC system
Infrastructure
PROJECT COST
$
Details

Recreation Centers Youth Gym

Updating the Youth Center's gymnasium
Infrastructure
PROJECT COST
$
Details

Refuse Packer

Replacement packer for Public Works
Infrastructure
PROJECT COST
$
Details

Repaint Springhill Lake Recreation Center (Interior)

Springhill Lake Recreation Center Improvements
Infrastructure
PROJECT COST
$
Details

Rollback Truck

Purchase a rollback truck for Public Works
Infrastructure
PROJECT COST
$
Details

Solar Charging Stations (Phone Chargers at Parks)

Install solar charging stations for mobile devices at City parks and visitor centers
Infrastructure
PROJECT COST
$
Details

Springhill Lake Recreation Center Doors/Entry

Improvements for SHLRC
Infrastructure
PROJECT COST
$
Details

Springhill Lake Recreation Center Playground Rehabilitation

Rehabilitate and upgrade the playground at Springhill Lake Recreation Center
Infrastructure
PROJECT COST
$
Details

Street Lighting Upgrade Pilot

Lighting upgrades for City streets
Infrastructure
PROJECT COST
$
Details

Tables for Recreation Center, Ground Floor East

Purchase tables for GFE
Infrastructure
PROJECT COST
$
Details

Tennis Court Resurfacing

Tennis Court Upgrades
Infrastructure
PROJECT COST
$
Details

Youth Center HVAC

Update the Youth Center's HVAC systems
Infrastructure
PROJECT COST
$
Details

[Proposed] Camera Scope for Stormwater

Infrastructure
PROJECT COST
$
Details

[Proposed] GIS Probe

Infrastructure
PROJECT COST
$
Details

[Proposed] Road and Sidewalk Condition Assessment

Infrastructure
PROJECT COST
$
Details
by the numbers

Department ARPA Funds

The City of Greenbelt has curated these projects after countless hours spent gathering input from the community, discussing at City Council work sessions, and after carefully drawing up plans for each project. For an overview of how each department is directly contributing to ARPA projects, view the numbers below.
70000
1000000
72000
71400
22500
250000
65000
22000
75000
500000
75000
75000
0
900000
50000
75600
100000
50000
33800
12500
324000
11775
0
15500
475000
50000
70000
Recreation Centers Youth Gym
1000000
Community Center Update
72000
Dump Truck (Parks)
71400
Ford Custom Cab (Parks)
22500
Deep Tine Aerator (Parks)
250000
Buddy Attick Park Inclusive Playground
65000
Municipal Building & Springhill Lake Recreation Center HVAC
22000
Fuel Management System
75000
Rollback Truck
500000
GAFC Pool Remediation
75000
Electric Bus
75000
Solar Charging Stations (Phone Chargers at Parks)
0
Youth Center HVAC
900000
Annual Road Resurfacing
50000
Street Lighting Upgrade Pilot
75600
Dump Truck (Public Works)
100000
Annual Concrete Infrastructure Repair
50000
Bridge Repair
[Proposed] Camera Scope for Stormwater
33800
Drainage Culvert
[Proposed] GIS Probe
12500
Tables for Recreation Center, Ground Floor East
324000
Refuse Packer
11775
Repaint Springhill Lake Recreation Center (Interior)
0
[Proposed] Road and Sidewalk Condition Assessment
15500
Springhill Lake Recreation Center Doors/Entry
475000
Springhill Lake Recreation Center Playground Rehabilitation
50000
Tennis Court Resurfacing